img img

Name:Automotive Chassis Project

Features:All fixtures adopt standard electrically controlled fixtures of 2000*1000. Mitsubishi PLC. The whole project includes 12 sets of fixtures with dual-machine arc welding. The planned annual capacity of the project is 60,000 units.

Category:Arc Welding Fixtures

【Introduction】

Photos

41.png


Assembly Photos

42.png

Go Back
Copyright© 2018 Suzhou Taiying Automation Equipment Co., Ltd. Copyright
Copyright© 2018 Suzhou Taiying Automation Equipment Co., Ltd. Copyright
ICP Record No.:
网站建设: